Jarvis Rail Oxenholme Feeder Area Return Screening Conductor Insulation
Aspire Rail completed the work at the Oxenholme feeder area, during the period (date) 30 Booster transformers were removed, 15 insulated overlaps were modified, 5 line side switches were reconfigured, 30 new lengths of feeder cable installed, 48km of return conductor installed, 120 RSC to Rail Bonds installed and connected and 100 track to track bonds installed and connected.
Aspire Rail were also contracted by Jarvis/Network Rail to complete the installation of 48km of RSC conductor and to connect the conductor into the traction return system at periodic intervals, SWTH testing was also delivered.